Equipment selection

After the concept and working drawings are approved we move to selecting fixtures and control components — fully matched to the calculated scenario, the architecture and your budget.

We are not tied to a brand. We are tied to your project.

Each selected fixture must

  • Match the approved concept and the photometric calculations.
  • Deliver the required lighting effects and visual comfort.
  • Integrate cleanly with the architecture and the interior.
  • Match the project’s quality bar and budget.

How we select

  1. 01

    Analyse project requirements

    We study the approved working documentation and prepare a detailed technical brief — purpose of each room, usage scenarios, normative requirements, aesthetic and installation constraints.

  2. 02

    Build a preliminary equipment list

    Several optimal options are picked for each zone (general, accent, decorative, technical) — drawing on leading European brands, premium Asian solutions and trusted local suppliers.

  3. 03

    Coordinate with the client and design team

    We prepare visual presentations and specifications and walk the client and architect/designer through preferences for style, finishes and integration.

  4. 04

    Lock the list and prepare for procurement

    The agreed list becomes a procurement specification: stock checks, optimised delivery routes, customs and warranty terms agreed before purchase.

Following the right sequence — concept → working drawings → equipment selection — avoids the most common construction-phase problems: fixtures that don’t fit the project, insufficient light, awkward integration and schedule slips.